The client – one of the US big 3 automobile manufacturers – had no process for identifying operating costs of their in-plant tuggers (equipment used to move materials from railcar and truck-trailers to the assembly line).

The Challenge

The client – one of the US big 3 automobile manufacturers – had no process for identifying operating costs for their in-plant tuggers (equipment used to move materials from railcar and truck-trailers to the assembly line).

Project Solutions

  • Project Solution 1

    After assessing the equipment utilization demand (operational hours) versus available up-time a fleet rightsizing strategy was developed

  • Project Solution 2

    A planned attrition plan was implemented based on time and economic useful lifecycle assumptions

  • Project Solution 3

    Specified replacement asset parameters. Vetted and validated equipment manufactures. Created a usages based financing solution

Project Completion 92%
Customer Satisfaction 100%
* Reduced OPEX 22%
Asset Utilization Improvement 39%
Asset Uptime Improvement 50%
Asset ROI Improvement 31%

* OPEX, as used in this graph, is limited to the assets defined within the project.